【题目一】●热点综述2012年10月16日10点30分,随着国家西气东输三线工程建设领导小组组长、国家发改委主任张平一声令下,举世瞩目的西气东输三线(简称西三线)工程正式开工。全长7378千米的西三线,设计年输气量达300亿立方米,途经新疆、甘肃、宁夏、陕西、河南、湖北、湖南、江西、福建、广东10个省区。西气东输三线包括1条干线、8条支线,配套建设3座储气库和1座液化天然气(LNG)站,全线计划2015年全线贯通。工程分西段、中断和东段三部分实施,其中西段计划2013年底建成投产;中段计划2015年前分步建成投运;东段计划2014年建成投产。
Topic 1 ● Hot Summary At 10:30 on October 16, 2012, with the State West Gas Transmission Project Construction Leading Group Leader, National Development and Reform Commission Zhang Ping ordered, the world-renowned West Third East Third Line (Referred to as the West Third Line) project officially started. The total length of 7378 km West Third Line, designed annual gas transmission capacity of 30 billion cubic meters, through Xinjiang, Gansu, Ningxia, Shaanxi, Henan, Hubei, Hunan, Jiangxi, Fujian and Guangdong provinces and 10 provinces. The third West-East Gas Pipeline consists of one trunk line and eight branch lines, supporting the construction of three gas storage tanks and one liquefied natural gas (LNG) station. The whole line is planned to be fully connected in 2015. The project is divided into the western section, the interrupted section and the eastern section. The western section of the project is planned to be completed and put into production by the end of 2013; the middle section is scheduled to be completed and put into operation by 2015; the eastern section is scheduled to be completed and put into operation in 2014.