论文部分内容阅读
江苏省溧阳市天目湖沙河抽水蓄能电站距南京市120km。该电站安装2×50000kW抽水蓄能机组,于1998年第三季度正式开工,建设工期3年。吴县纯阳坞抽水蓄能电
The Tianmu Lake Shahe Pumped Storage Power Station in Liyang City, Jiangsu Province is 120km away from Nanjing. The power station installed 2×50000kW pumped storage units and was officially started in the third quarter of 1998. The construction period is 3 years. Wu County Chunyangwu pumped storage power