变电站实施无人值班已在全国范围内推广应用,将常规变电站改造为综合自动化变电站,需要将二次设备甚至一次设备全部更新,造价高,投入产出低。在仅仅采用远动自动化技术,对常规变电站实施无人值班改造,不对二次设备进行较大改动和保持原有变电站基本功能的前提下,实现“四遥”功能,不失为一条成功的经验。提出了对常规变电站进行无人值班改造的基本原则和技术要求,介绍了无人值班改造的工程内容和基本方法,并总结了现场施工中的一些有益的经验。
Substation implementation of unattended has been popularized throughout the country, the conventional substation transformed into an integrated automation substation, the need for a secondary equipment or even a full update of equipment, high cost, low input-output. In the mere use of remote automation technology, the implementation of unmanned conventional substation transformation, without major changes in secondary equipment and to maintain the basic functions of the original substation under the premise of “four remote” function, after all, a successful experience . The basic principles and technical requirements for unmanned transformation of conventional substations are put forward. The contents and basic methods of unattended reconstruction are introduced, and some useful experiences in on-site construction are summarized.