摘要:后浇带是一种砼刚性接缝,适用于不宜设置柔性变形缝以及后期变形趋于稳定的结构,如果施工工艺不合理,施工中混凝土浇筑质量控制不好,易出现开裂、渗漏等质量事故,影响结构的安全使用。本文首先阐述了施工后浇带的主要功能,其次,分析了后浇带在设置期间出现的问题,同时,就建筑工程施工中如何有效解决后浇带问题进行了深入的探讨,具有一定的参考价值。
关键词:建筑工程;施工;后浇带
Abstract: of the pouring belt is a concrete rigid juncture, used in flexible unfavorable setting deformation cracks and later deformation become stable structure, if not reasonable construction technology, construction of concrete casting quality control is not good, easy appear craze, such as leakage quality accident and affect the structure of safe use. This paper expounds the construction of the pouring belt of the main function, secondly, the analysis of the pouring belt in the problems during the set, and at the same time, the architectural engineering construction, how to effectively solve the problem of the pouring belt thoroughly discussed, to have the certain reference value.
Keywords: building engineering; The construction; Post-cast strip
中图分类号:K826.16文献标识码:A文章编号:
1. 前言
后浇带是指在现浇整体钢筋混凝土结构中,在施工期间保留的临时性温度、收缩沉降的变形缝。该缝根据工程具体条件,保留一定时间(保留时间一般保留到结构封顶后,且不少于40天),在此期间早期温差及30%以上的收缩已完成,再用比原结构提高一级的混凝土填筑密实后成为连续、整体、无伸缩缝的结构。它是一种砼刚性接缝,适用于不宜设置柔性变形缝以及后期变形趋于稳定的结构,如果施工工艺不合理,施工中混凝土浇筑质量控制不好,易出现开裂、渗漏等质量事故,影响结构的安全使用。
2. 施工后浇带的主要功能
用于解决高层主体与低层裙房的差异沉降者,称为后浇沉降带;用于解决钢筋混凝土收缩变形者,称为后浇收缩带;用于解决混凝土温度应力者,称为后浇温度带。后浇带一般可同时考虑几种作用,但终究是临时性的措施,待将该处混凝土补齐后,才能得到充分发挥,所以施工也有特點。
这种后浇带一般具有多种变形缝的功能,设计时应考虑以一种功能为主,其他功能为辅。施工后浇带是整个建筑物,包括基础及上部结构施工中的预留缝(“缝”很宽,故称为“带”),待主体结构完成,将后浇带混凝土补齐后,这种“缝”即不存在,既在整个结构施工中解决了高层主楼与低居裙房的差异沉降,又达到了不设永久变形缝的目的。
3. 后浇带在设置期间出现的问题分析
在主体结构中后浇带设置宽度常见的有1 000 mm和800 mm两种,在后浇带处钢筋不论是连通还是断开,都会使通过后浇带处的梁、板由原先的连续结构体系变为悬挑结构体系,梁、板按原有结构体系计算所配置的钢筋就有可能不能满足施工阶段的要求。在施工过程中,有些做法是在断开的梁端加竖向支撑,使其成为一端固定、一端简支的结构。
由于施工人员对此种做法理论依据缺乏足够的了解,容易出现一些问题。如:后浇带两边的梁板在混凝土浇注完成并达到设计强度后,便拆除梁板下的支撑模板,然后再象征性地在悬挑端加L。一个支撑。由于后加的支撑与梁端之间连接不严密或支撑基础不牢,当竖向支撑真正承受荷载时此梁在其根部会出现裂缝而形成质量缺陷。除此以外,有些施工人员的做法是将此梁按一般的悬挑梁施工,待其混凝十强度达到100%(或28 d)便拆除支撑。由于施工现场管理不严格,施工时在临时悬挑梁板从属区域内堆放施工材料或是将上部分隔墙直接砌筑上去,从而使得悬挑所承担的实际荷载超出其承载力而造成梁上部出现裂缝甚至破坏。
4. 建筑工程施工中如何有效解决后浇带问题
(1)采取措施确保后浇带处钢筋的准确位置
后浇带一般预留700-1000mm,常用者为800mm宽,是考虑施工操作的需要,钢筋应保证准确位置而连续不断,对于板,单层钢筋下应设置垫块,双层钢筋应设置支架,对于梁,底部钢筋亦应加垫块,上部钢筋一般直径较大,可不用支架,但应注意的是在后浇带部位应设马道通过,不应直接踩钢筋。
(2)后浇带补齐混凝土后的整体连接问题
采用钢筋支架铅丝网隔断,后浇带两侧混凝土应局部干硬一些,即水灰比小一些,既保证槎捣密实,又不跑浆,使侧面混凝土强度和其它混凝土一致。在浇注混凝土前,应将后浇带处侧面混凝土凿毛,清刷干净,底部碎屑清除彻底。
(3)后浇带灌注混凝土的时间问题
当高层采用天然地基,或以摩擦为主的桩基时,由于高层沉降量较大,应待高层主体结构完成后,再浇注后浇带;当高层主楼基础座在卵石层或基岩上,或以端承桩为主的摩擦桩时,由于高层沉降量较小,可根据施工期间的沉降观测,确定在高层主体结构施工到一定高度时,灌注后浇带。
(4)后浇收缩带,后浇温度带灌注混凝土的时间问题
后浇带主要是指后浇沉降带,或者同时也是收缩带和温度带,即同时起到三种作用。如果后浇收缩带单独设置,则灌注混凝土的时间宜在设带后的两个月之后,这样估计可以完成混凝土收缩的60%以上,如确有困难时也不宜少于一个月;如果后浇温度带单独设置,则灌注混凝土的时间宜选择在温度较低时,不要在热天补齐冷天留下来的后浇温度带。
(5)保证后浇带两侧混凝土浇筑质量
①保证后浇带两侧浇筑质量。施工中必须保证后浇带两侧混凝土浇筑质量,防止漏浆,或混凝土疏松。后浇带两侧应采用钢筋支架钢丝网隔断,并由结构设计人员确定两侧断面形式,当地下室有防水要求时,地下室后浇带不宜留成直槎。②专人负责后浇带内的清洁。施工单位应指派专人负责保持后浇带内的清洁,防止后浇带内的钢筋锈蚀,或钢筋被压弯、踩弯。在封闭施工后浇带之前,应将后浇带内的杂物清理干净,做好钢筋的除锈工作,并将两侧混凝土凿毛,涂刷界面剂,后浇带混凝土应比两侧混凝土强度等级增大一级,并且采用掺加了微膨胀剂的补偿收缩混凝土浇筑。③控制浇筑时环境温度。后浇带混凝土浇筑时,宜控制其环境温度低于两侧混凝土浇筑时的环境温度,并应有专人负责。后浇带混凝土浇筑完毕后,应注意做好养护工作。后浇带混凝土浇筑后仍应浇水养护并及时覆盖塑料薄膜,养护时间不得不于28d。
(6)加强后浇带的防护
①为防止地下水浸入基础底板混凝土后浇带,在基础后浇带的两端应增设临时挡水墙,挡水墙的高度应高于底板,墙的两侧抹防水砂浆。
②为防止后浇带周围施工用水或雨水流进后浇带内,应在后浇带的两侧500mm左右的位置处,用砂浆做出宽50mm、高50~100mm的挡水带。
③为防止杂物落入后浇带内污染钢筋、防止后浇带内钢筋被踩弯或压弯,在施工缝处理完毕并清理干净后,后浇带的顶部应用木板、模板或铁皮遮盖,并在四周设置临时栏杆维护。
(7)减小温度收缩影响
新浇混凝土在硬结过程中会收缩,己建成的结构受热要会膨胀,受冷则收缩。混凝土硬结收缩的大部分将在施工后的1月~2个月完成,而温度变化对结构的作用则是经常的。当其变形受到约束时,在结构内部就产生温度应力,严重时就会在构件中出现裂缝。留出后浇带后,施工过程中混凝土可以自由收缩,从而大大减少了收缩应力。混凝土的抗拉强度可以大部分用来抵抗温度应力,提高结构抵抗温度变化的能力。
5.结束语
对建筑工程的后浇带施工要做到技术先进、工艺合理、施工规范,才能满足建筑功能要求,确保结构受力安全和后浇带处无渗漏现象,避免不可预见因素对后浇带施工质量的影响,杜绝后浇带施工质量通病的发生。
参考文献:
[1] 朱晓忠,孙建安. 主楼裙房结构工程后浇带施工技术浅析[J]. 陕西建筑, 2009,(10) .
[2] 田定印,毛国强. 现浇混凝土结构地下室后浇带的施工[J]. 陕西建筑, 2008,(10) .
[3] 王有峰. 分析建筑工程中现浇钢筋混凝土板出现裂缝问题[J]. 中国建设教育, 2008,(05) .
[4] 易兵. 浅析建筑工程现场施工技术管理措施[J]. 陕西建筑, 2011,(02) .
[5] 王锦. 建筑工程施工质量的控制[J]. 陕西建筑, 2010,(04)
注:文章内所有公式及图表请用PDF形式查看。
关键词:建筑工程;施工;后浇带
Abstract: of the pouring belt is a concrete rigid juncture, used in flexible unfavorable setting deformation cracks and later deformation become stable structure, if not reasonable construction technology, construction of concrete casting quality control is not good, easy appear craze, such as leakage quality accident and affect the structure of safe use. This paper expounds the construction of the pouring belt of the main function, secondly, the analysis of the pouring belt in the problems during the set, and at the same time, the architectural engineering construction, how to effectively solve the problem of the pouring belt thoroughly discussed, to have the certain reference value.
Keywords: building engineering; The construction; Post-cast strip
中图分类号:K826.16文献标识码:A文章编号:
1. 前言
后浇带是指在现浇整体钢筋混凝土结构中,在施工期间保留的临时性温度、收缩沉降的变形缝。该缝根据工程具体条件,保留一定时间(保留时间一般保留到结构封顶后,且不少于40天),在此期间早期温差及30%以上的收缩已完成,再用比原结构提高一级的混凝土填筑密实后成为连续、整体、无伸缩缝的结构。它是一种砼刚性接缝,适用于不宜设置柔性变形缝以及后期变形趋于稳定的结构,如果施工工艺不合理,施工中混凝土浇筑质量控制不好,易出现开裂、渗漏等质量事故,影响结构的安全使用。
2. 施工后浇带的主要功能
用于解决高层主体与低层裙房的差异沉降者,称为后浇沉降带;用于解决钢筋混凝土收缩变形者,称为后浇收缩带;用于解决混凝土温度应力者,称为后浇温度带。后浇带一般可同时考虑几种作用,但终究是临时性的措施,待将该处混凝土补齐后,才能得到充分发挥,所以施工也有特點。
这种后浇带一般具有多种变形缝的功能,设计时应考虑以一种功能为主,其他功能为辅。施工后浇带是整个建筑物,包括基础及上部结构施工中的预留缝(“缝”很宽,故称为“带”),待主体结构完成,将后浇带混凝土补齐后,这种“缝”即不存在,既在整个结构施工中解决了高层主楼与低居裙房的差异沉降,又达到了不设永久变形缝的目的。
3. 后浇带在设置期间出现的问题分析
在主体结构中后浇带设置宽度常见的有1 000 mm和800 mm两种,在后浇带处钢筋不论是连通还是断开,都会使通过后浇带处的梁、板由原先的连续结构体系变为悬挑结构体系,梁、板按原有结构体系计算所配置的钢筋就有可能不能满足施工阶段的要求。在施工过程中,有些做法是在断开的梁端加竖向支撑,使其成为一端固定、一端简支的结构。
由于施工人员对此种做法理论依据缺乏足够的了解,容易出现一些问题。如:后浇带两边的梁板在混凝土浇注完成并达到设计强度后,便拆除梁板下的支撑模板,然后再象征性地在悬挑端加L。一个支撑。由于后加的支撑与梁端之间连接不严密或支撑基础不牢,当竖向支撑真正承受荷载时此梁在其根部会出现裂缝而形成质量缺陷。除此以外,有些施工人员的做法是将此梁按一般的悬挑梁施工,待其混凝十强度达到100%(或28 d)便拆除支撑。由于施工现场管理不严格,施工时在临时悬挑梁板从属区域内堆放施工材料或是将上部分隔墙直接砌筑上去,从而使得悬挑所承担的实际荷载超出其承载力而造成梁上部出现裂缝甚至破坏。
4. 建筑工程施工中如何有效解决后浇带问题
(1)采取措施确保后浇带处钢筋的准确位置
后浇带一般预留700-1000mm,常用者为800mm宽,是考虑施工操作的需要,钢筋应保证准确位置而连续不断,对于板,单层钢筋下应设置垫块,双层钢筋应设置支架,对于梁,底部钢筋亦应加垫块,上部钢筋一般直径较大,可不用支架,但应注意的是在后浇带部位应设马道通过,不应直接踩钢筋。
(2)后浇带补齐混凝土后的整体连接问题
采用钢筋支架铅丝网隔断,后浇带两侧混凝土应局部干硬一些,即水灰比小一些,既保证槎捣密实,又不跑浆,使侧面混凝土强度和其它混凝土一致。在浇注混凝土前,应将后浇带处侧面混凝土凿毛,清刷干净,底部碎屑清除彻底。
(3)后浇带灌注混凝土的时间问题
当高层采用天然地基,或以摩擦为主的桩基时,由于高层沉降量较大,应待高层主体结构完成后,再浇注后浇带;当高层主楼基础座在卵石层或基岩上,或以端承桩为主的摩擦桩时,由于高层沉降量较小,可根据施工期间的沉降观测,确定在高层主体结构施工到一定高度时,灌注后浇带。
(4)后浇收缩带,后浇温度带灌注混凝土的时间问题
后浇带主要是指后浇沉降带,或者同时也是收缩带和温度带,即同时起到三种作用。如果后浇收缩带单独设置,则灌注混凝土的时间宜在设带后的两个月之后,这样估计可以完成混凝土收缩的60%以上,如确有困难时也不宜少于一个月;如果后浇温度带单独设置,则灌注混凝土的时间宜选择在温度较低时,不要在热天补齐冷天留下来的后浇温度带。
(5)保证后浇带两侧混凝土浇筑质量
①保证后浇带两侧浇筑质量。施工中必须保证后浇带两侧混凝土浇筑质量,防止漏浆,或混凝土疏松。后浇带两侧应采用钢筋支架钢丝网隔断,并由结构设计人员确定两侧断面形式,当地下室有防水要求时,地下室后浇带不宜留成直槎。②专人负责后浇带内的清洁。施工单位应指派专人负责保持后浇带内的清洁,防止后浇带内的钢筋锈蚀,或钢筋被压弯、踩弯。在封闭施工后浇带之前,应将后浇带内的杂物清理干净,做好钢筋的除锈工作,并将两侧混凝土凿毛,涂刷界面剂,后浇带混凝土应比两侧混凝土强度等级增大一级,并且采用掺加了微膨胀剂的补偿收缩混凝土浇筑。③控制浇筑时环境温度。后浇带混凝土浇筑时,宜控制其环境温度低于两侧混凝土浇筑时的环境温度,并应有专人负责。后浇带混凝土浇筑完毕后,应注意做好养护工作。后浇带混凝土浇筑后仍应浇水养护并及时覆盖塑料薄膜,养护时间不得不于28d。
(6)加强后浇带的防护
①为防止地下水浸入基础底板混凝土后浇带,在基础后浇带的两端应增设临时挡水墙,挡水墙的高度应高于底板,墙的两侧抹防水砂浆。
②为防止后浇带周围施工用水或雨水流进后浇带内,应在后浇带的两侧500mm左右的位置处,用砂浆做出宽50mm、高50~100mm的挡水带。
③为防止杂物落入后浇带内污染钢筋、防止后浇带内钢筋被踩弯或压弯,在施工缝处理完毕并清理干净后,后浇带的顶部应用木板、模板或铁皮遮盖,并在四周设置临时栏杆维护。
(7)减小温度收缩影响
新浇混凝土在硬结过程中会收缩,己建成的结构受热要会膨胀,受冷则收缩。混凝土硬结收缩的大部分将在施工后的1月~2个月完成,而温度变化对结构的作用则是经常的。当其变形受到约束时,在结构内部就产生温度应力,严重时就会在构件中出现裂缝。留出后浇带后,施工过程中混凝土可以自由收缩,从而大大减少了收缩应力。混凝土的抗拉强度可以大部分用来抵抗温度应力,提高结构抵抗温度变化的能力。
5.结束语
对建筑工程的后浇带施工要做到技术先进、工艺合理、施工规范,才能满足建筑功能要求,确保结构受力安全和后浇带处无渗漏现象,避免不可预见因素对后浇带施工质量的影响,杜绝后浇带施工质量通病的发生。
参考文献:
[1] 朱晓忠,孙建安. 主楼裙房结构工程后浇带施工技术浅析[J]. 陕西建筑, 2009,(10) .
[2] 田定印,毛国强. 现浇混凝土结构地下室后浇带的施工[J]. 陕西建筑, 2008,(10) .
[3] 王有峰. 分析建筑工程中现浇钢筋混凝土板出现裂缝问题[J]. 中国建设教育, 2008,(05) .
[4] 易兵. 浅析建筑工程现场施工技术管理措施[J]. 陕西建筑, 2011,(02) .
[5] 王锦. 建筑工程施工质量的控制[J]. 陕西建筑, 2010,(04)
注:文章内所有公式及图表请用PDF形式查看。