论文部分内容阅读
文章陈述了新建哈密至将军庙铁路阿克萨依二号隧道进口勘察过程中采用的的综合勘探方法。通过地质调查,综合物探、深孔钻探、物理测井等方法相结合,对隧道进口进行地质勘察。论证了综合勘探方法不仅能取得较为理想的应用成果,为隧道地质评价提供有力的依据,而且能缩短工期降低勘探成本。
The article states the integrated exploration method adopted during the survey of the import of Aksaiai No. 2 tunnel from Hami to Jiangjunmiao Railway. Through geological survey, integrated geophysical prospecting, deep hole drilling, physical logging and other methods, the geological survey of tunnel entrances. It is demonstrated that the comprehensive exploration method can not only obtain the ideal application results, but also provide a strong basis for the tunnel geological evaluation, and can shorten the construction period and reduce the exploration cost.