【摘 要】
:
葛洲坝二江泄水闸是泄洪和排沙的主要通道。去年特大洪水期间,闸室和护坦受到大流量、高流速的江水所挟带的大量泥沙和卵砾石的冲刷,出现了麻面、腐蚀和气蚀等破损现象。为
论文部分内容阅读
葛洲坝二江泄水闸是泄洪和排沙的主要通道。去年特大洪水期间,闸室和护坦受到大流量、高流速的江水所挟带的大量泥沙和卵砾石的冲刷,出现了麻面、腐蚀和气蚀等破损现象。为了保证泄水闸和整个枢纽的安全运行,必须在今年桃汛前全部修补完毕。为此,主要采用了两种修补方法。
Gezhouba Erjiang sluice is the main channel of flood discharge and sediment discharge. Last year during the flood period, sluice chambers and escort tanks were washed away by large amounts of sediment and gravel brought along by high-flow and high-velocity rivers, causing damage such as pitting, corrosion and cavitation. In order to ensure the safe operation of the sluice gate and the entire hub, it must be completely repaired before the peach flood this year. To this end, mainly used two methods of repair.
其他文献
一、施工时間和注意掌握的原則: 利用农閑和雨后整修播种前及收割后的半休閑地,在修时应考虑到目前利益和長远利益相結合,井注意确定适当田面寬度,以便利耕作和当年增产。土
介绍了起动机功率大、工作时间短以及其啮合系统的特点,以引起初学者的兴趣。
Introduced the starter power, short working time and the characteristics of its meshing
会议期间听取了许多同志的彙报,以后又进行了现场勘察;我们对位山枢纽工程进行了研究分析,意见是一致的。现在综合了我们的意见,并接受了其他二位同志的委托,利用这个机会向
大規模的兴修水利运动已在內蒙古自治区初步掀起高潮。全区二十二万名水利大軍热烈响应党的号召,热情奋發地先后到达工地,投入战斗。到11月5日为止,全区已有十九項水利建設
目前,全国有加油站88000余座,而石油集团仅有6000余座,占全国总量的7%,其中石油集团所管区域内有5000座,占区内总量的20%,区外1000座,占区外总量的1.5‰,作为产销一体化的集团
本文介绍了一种新型的发光二极管(LED)恒流驱动电路SC16749,该电路应用了“智能均衡脉宽调制(B-PWM)”的专利技术,可同时提高LED显示系统的亮度利用率和刷新率这两项重要性能
中共甘肃省靜宁县委根据全国第三次水土保持会議提出的“山区园林化、坡地梯田化、溝墾川台化、耕地水利化”的水土保持高标准的精神,于1958年冬季,依靠了人民公社的优越性,
自10月下旬开始,宁夏回族自治区掀起了比1958年規模更大的水利建设高潮。到11月中旬,投入水利战綫的劳力已达二十六万人,占农村总劳力的百分之三十五。已做土石方一千三百多
苏联水土保持专家札斯拉夫斯基同志于1956年来华,在两年多的时间内,曾先后到永定河、黄河、长江、辽河等流域进行考察,并参加专业会议,对于我国的水土保持工作,从工作方针方