论文部分内容阅读
京包——包兰铁路两侧绿化工程在我区境内东起丰镇市,西至巴彦高勒镇,建设范围包括丰镇、察右前、集宁、卓资、呼市郊区、土左、土右、包头郊区、乌拉特前、五原、临河、杭锦后、磴口等13个旗县(市、区),铁路线总长702公里,大部分地段和110国道平行,建设任务72.4万亩.建设期限为1997—2000年.为加大工作力度.加快建设步伐.如期完成京包——包兰铁路和110国道绿色通道工程建设任务.自治区林业厅召开厅长办公会议,专题研究绿色通道工程建设问题.要求把京包——包兰铁路和110国道两侧绿化工程作为“九五”期间我区林业建设的重中之重,优先安排,高标准严要求,建成体现自治区形象和林业建设水平的窗口和示范工程.为了加强对此项工作的领导,自治区林业厅设立了京包——包兰铁路和110国道两侧绿色通道工程办公室,抽调人员专抓此项工作.
Beijing package - both sides of the Baotou-Lanzhou railway greening projects in the region east of Fengzhen City, west of Bayan Gaolezhen, the scope of construction, including Fengzhen, Tsaristar, Jining, Zhuozi, Hohhot suburb, left , The right of the earth, Baotou suburbs, the former Wulate, Wuyuan, Linhe, Hangjin, Qiaokou and other 13 counties (cities, districts), the railway line total length of 702 km, most of the 110 State Road parallel and construction tasks 72.4 Mu. The construction period is from 1997 to 2000. In order to step up the pace of construction, complete the construction of the Beijing-Baotou-Baotou-Lanzhou Railway and the green passage project of State Road 110 on schedule.The autonomous region forestry department convenes the office meeting of director and special subject Green Passage Project Construction Requirements. It is required that the “Beijing-Baotou-Baotou Railway” and the afforestation project on both sides of State Road 110 be taken as the most important task in the forestry construction in our region during the Ninth Five-Year Plan period. Priority should be given to those with high standards and strict requirements. And the level of forestry construction window and demonstration project.In order to strengthen the leadership of this work, the autonomous region forestry hall set up the Beijing package - the Baotou Railway and State Road 110 on both sides of the Green Passage Project Office, dispatched staff to catch this work.