论文部分内容阅读
详细介绍五强溪水电厂500kVGIS构成元件,主要技术特点及安装、调试程序和方法。
The components of 500kVGIS in Wuqiangxi Hydropower Plant are introduced in detail. The main technical features, installation procedures, debugging procedures and methods are introduced.