论文部分内容阅读
打坝淤地是我省群众治沟造田的传统经验,在晋西已有500多年的历史。淤地坝对于缓洪减沙、固沟防冲、变荒沟为良田、改变山区的农业生产条件有着显著的作用。建国30多年来,我省坝地面积由1.3万余亩发展到220多万亩;在筑坝规模和施工技术等方面都有很大发展。户包治理小流域的出现,为打坝淤地开创了新的局面,同时也提出了新的问题。本文着重就我省兴建大、中型拦泥淤地坝的必要性和可行性,作一初步探讨。
Dam construction is a traditional experience of mass grave farming in our province and has more than 500 years of history in western Shanxi. Warping dam for slowing sediment reduction, solid ditch anti-redirection, variable wasteland as fertile land, change the mountain agricultural production conditions have a significant role. Over the past 30 years since the founding of the People’s Republic of China, the area of dams in our province has grown from more than 1.3 million mu to more than 220 million mu; great progress has been made in dam construction scale and construction technology. The emergence of small parcels to manage small watersheds opened up a new situation for damming dam sites and raised new problems. This article focuses on the construction of large and medium-sized dam in our province the necessity and feasibility of silt dam for a preliminary study.