蚌埠电厂2×600 MW机组工程软岩回填地基与运行期工况不一致,通过一系列试验,分析了软岩回填施工的有关问题。
The soft rock backfill foundation of 2 × 600 MW units in Bengbu Power Plant is not consistent with the operating conditions. Through a series of tests, the problems of soft rock backfill construction are analyzed.