霍普山水电工程位于新泽西北部,它是一个2000MW 的抽水蓄能水电站,于1996年开工。该工程为经联邦能源管理委员会(FERC)批准施工的第三大水电站。该工程将于2002年投入运行,届时将成为世界上第二大的抽水蓄能电站。本文对霍普山工程的设计过程进行了论述,以保证工程的最终设计与环境及经济发展相协调。霍普山工程紧邻新泽西郊区的一个主要负荷中心修建。要求其施工影响小,并与人
Hope Mountain Hydropower Project is located in northern New Jersey, it is a 2000MW pumped storage hydropower station, started in 1996. The project is the third largest hydropower station approved by the Federal Energy Regulatory Commission (FERC). The project will be put into operation in 2002, will be the world’s second largest pumped storage power station. This article discusses the design process of Hope Hill Project to ensure that the final design of the project is in harmony with the environment and economic development. The Hope Hill project is located next to a major load center in New Jersey suburb. Requires its construction impact is small, and with people