土建工程施工进度控制与管理的探讨

来源 :门窗 | 被引量 : 0次 | 上传用户:dxy_10121012
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
施工进度控制是施工建设过程中非常复杂而且系统的一项工作,整个工程有很多细小环节组成,其不仅要求施工单位做好内控管理,还需要施工单位和监管机构的共同协助,进而确保工程的顺利进行。本文通过探讨影响建筑工程施工进度因素和土建工程施工进度控制与管理的措施,将影响因素和管理措施详细展开讨论,得到了如何才能行之有效的对土建工程施工进度进行有效管控的结论。 Construction progress control is a very complex and systematic work in the process of construction. There are many small steps in the whole project. It not only requires the construction unit to do internal control management, but also needs the help of the construction unit and the supervisory agency to ensure that the project Smooth progress. This paper discusses the factors that affect the progress of construction projects and the progress of civil engineering construction control and management measures, discusses the influencing factors and management measures in detail, and obtains the conclusion that how to effectively control the construction progress of civil works effectively.
其他文献
本文顺应新时期工程管理学术研究潮流对工程管理理论体系(英文简称EMTS)框架展开论述,从国内EMTS逻辑起点进行着手分析,之后对国内EMTS框架模型予以研究,以期为后续关于EMTS方
招投标体系是保障工程施工建设的关键环节,是决定承建方选择的重要依据。为此,无论是产权方的承建单位选择,还是建设单位的工程业务来源,均无法脱离招投标体系。在这样的背景
以3T系统(TIPS,TCBS和TMIS系统)为核心的国库信息系统建设的不断推进,导致大量具有分析、研究、决策等功能价值的数据形成。如何将云存储系统应用到国库数据管理中,对构建现代
针对海上应急救援基地规划比较单一的问题,结合渤海海域交通流特征和海上交通事故的统计结果,提出了应急救援基地双覆盖优化模型。综合考虑了渤海海域环境条件和事故发生率的