The Construction of the Qinghai - Tibet Railway and It's Impact on Tibetan Development

来源 :China Tibetology | 被引量 : 0次 | 上传用户:lygwzs
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The Qinghai to Tibet railway began full operation from July 1, 2006. It symbolises Tibet’s historical inaccessibility via railway. The total distance from Lhasa to Xining by railway is 1956 kilometres, and it is the world’s highest railway extending for the longest distance through a plateau of permanent frost. The Qinghai to Tibet railway began full operation from July 1, 2006. It symbolises Tibet’s historical inaccessibility via railway. The total distance from Lhasa to Xining by railway is 1956 kilometres, and it is the world’s highest railway extending for the longest distance through a plateau of permanent frost.
其他文献
介绍了3种斜井掘进前卸式箕斗及其卸载装置的工作原理、施工要绩和使用中的优缺点,指出了发展前卸式箕斗及卸载装置的方向。
介绍了一种用于提升设备的新型防坠、防■罐装置,即用液压缓冲装置代替目前用的钢丝全绳摩擦式缓冲器,并阐述了其工作原理及设计要点。
研究了超高锰钢铸态和热处理态的显微组织、力学性能和耐冲击磨料磨损性能。结果表明,超高锰钢水韧后的组织为奥氏作基体上弥散分布有细小的碳化物颗粒和球形夹杂;变质处理使组
0系统概述为推进铁路现代化建设,实现铁路跨越式发展,铁道部进行了运输管理机构体制改革,不断提高技术装备水平。车 0 System Overview In order to promote the modernizat
利用压缩试验,通过硬度和磁性测量、X射线衍射等检测手段发现:Mn6(SR)钢变形过程中的磁性变化规律与其较高的加工硬化能力是一致的;其磁性变化是由形变诱发马氏体引起;且此钢种原始硬度高
产量的高速增长结束,产品的质量提升加速,速度换挡,结构优化,动力转换。表征一,行业的增长速度将放缓、减速。自行车产量将持续保持在8 000~8 500万辆之间;电动自行车超常规
Perez—Castro 最初开展输尿管肾镜术(1980年),国内郭氏在1986年首次报告.我院于1990年8月至1992年4月为32例患者行经尿道输尿管肾镜术,包括输尿管结石20例,其中经窥镜取石