山西中南部铁路石岭则蔚汾河特大桥主桥,位于800 m半径的反向曲线上,最大墩高90 m。列车荷载为“中-活载(2005)ZH载”(重载列车)。主桥采用(70+3×120+70)m刚构一连续梁的结构形式。作为国内首条300 kN轴重重载铁路,本桥的设计、施工及运营均对以后的重载铁路桥梁设计有着深远的影响。需要解决高墩大跨结构体系设计中刚度和结构释放温度力协调问题、高墩设计问题、施工线形控制问题、工后残余徐变线形控制等技术难题。结构设计采用Bsas、Midas、Ansys等程序建模进行结构对比分析,各项指标均满足设计要求,并通过动力仿真分析,能满足列车通过时对安全性、舒适性、平稳性的要求。
The Central South Railway Shanxi Shiling is the main bridge of Wei Fen River Bridge, located 800 meters radius of the reverse curve, the maximum pier height of 90 m. The train load is “Medium - Live (2005).” "(Heavy Haul Train). The main bridge using (70 +3 × 120 +70) m rigid frame continuous beam structure. As the first 300 kN heavy haul railway in the country, the design, construction and operation of this bridge have a profound impact on the design of heavy haul railway bridges in the future. It is necessary to solve such technical problems as the coordination of stiffness, the release of temperature and force, the design of high pier, the control of construction line and the residual creep control after construction in the design of high-span long-span structural system. Structural design Bsas, Midas, Ansys and other procedural modeling comparative analysis of the structure, the indicators meet the design requirements, and through the dynamic simulation analysis to meet the requirements of the train passing safety, comfort, stability.