攀钢建成转炉提钒工程

来源 :钢铁技术 | 被引量 : 0次 | 上传用户:hepingweixiao
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
攀钢120t转炉提钒车间业已建成,1号提钒转炉已于1995年8月7日投产成功,2号提钒转炉经过联动试车后,于9月15日也一次投产成功。两座炉相继投产后,生产都很顺利。指标也很满意。到11月底两座转炉都生产了第一个炉役。1号炉炉龄为959炉,2号炉炉龄1196炉。最大班产18炉(单炉生产),钒渣实物月产达3300t/月(含V_2O_5 17%),取得了较为理想成绩。在国内转 Vanadium converter plant in Panzhihua Iron and Steel (Group) Co., Ltd. has been completed. The vanadium converter on the 1st was put into operation successfully on August 7, 1995. After the commissioning of the vanadium converter on the 2nd, it was put into operation successfully on September 15. Two furnaces have been put into operation, the production is very smooth. Indicators are also very satisfied. By the end of November both converters had produced the first furnace. The furnace number 1 was 959 and the furnace number 2 1196. The largest production of 18 classes of furnace (single furnace production), vanadium slag in-kind monthly production of 3300t / month (including V2O5 17%), and achieved satisfactory results. Turn in the country
其他文献
浙江省人民政府令第170号《浙江省预算执行情况审计监督办法》已经省人民政府第20次常务会议审议通过,现予公布,自2004年5月1日起施行。省长吕祖善2004年3月16日 Zhejiang
预设往往和生成有着偏差,而这些偏差却有着微妙的效果。在教学实践中我们也需要不断地对教学进行预设,而结果并不是完全如预设所断,学生活跃的思维往往会产生出不同的结果,而
设计者:宁德地区教育局 柳超平执教者:宁德地区机关幼儿园 叶元珊 一、设计意图 大班幼儿已有一定的社会生活经验,对邮票很感兴趣,但了解得不够。通过“认识邮票”这一活动,
贯彻《规程》以来,经过几年的探索与实践,我们深刻地认识到,一些陈旧的教育思想及观念必须改革。因为它严重影响了21世纪人才的培养与教育,而人的素质如何又直接影响到祖国
国家财政部于 2001年 1月 18日发布了无形资产、借款费用以及租赁三项新的具体会计准则,以进一步提高会计信息质量。其中《企业会计准则——租赁》(以下简称新准则)对会计核算中
在新世纪即将到来之际,人们也许不会忘记,自90年代初,以卢嘉锡、钱学森、周光召为代表的一批中国科学院院士和中国工程院院士及广大科技工作者,在《中国科学报》上开展了以
据《自然)周刊报道,英国政府的生物技术和生物科学研究委员会(BBSRG)将拨出850万英镑(约1275万美元)用于建立一个结构生物学研究方面的多学科研究中心和更新设备。在结构生物学研究
起湾道为中山市规划实施的城区主干道,南端经金字山隧道后与城桂公路相接,北端沿石岐河经北延段与中山港火炬开发区的沿江大道相接。道路原长约为7km,红线宽为36m为三幅路断
发生连环自杀事件后,富士康表示将大幅提高员工工资,近期本田的零部件厂也发生员工罢工要求提高工资的事件。从更大范围看,2004年以后,中国劳动力成本上升、工人短缺就逐渐显
国际科技数据委员会(CODATA)是国际科学协会(ICSU)的一个跨学科委员会,建立于1966年,其宗旨在于改进科学和技术各个领域中重要数据的质量、可靠性、管理及可获取性.1996年9