1反应堆运行情况按照中国先进研究堆(CARR)运行室2016年度工作计划,CARR本年度申请运行共计5次,在不同功率水平下累计运行9 d,最大稳定运行功率为50 MW,总释放能量约63.944 MW·d。开堆过程中主要进行反应堆各系统状态测试、中子散射实验装置调试、实验测量以及样品辐照实验等。2维修、试验和检查按照《中国先进研究堆维修大纲》和《中国先进研究堆定期试验和检查大纲》要求进行系统和
1 Reactor Operation According to the 2016 work schedule of China Advanced Research Reactor (CARR) operating room, CARR applied for a total of 5 operations this year, accumulated operation for 9 days at different power levels, maximum stable operation power of 50 MW and total release energy of about 63.944 MW · d. Reactor in the reactor during the main state of the state system testing, neutron scattering experimental device debugging, experimental measurements and sample irradiation experiments. 2 Maintenance, testing and inspection In accordance with the “China Advanced Research Reactor Maintenance Outline” and “China Advanced Research Reactor periodic testing and inspection program” requirements for system and