宝盖洞水库土石混合坝崩垮的经验教训

来源 :中国水利 | 被引量 : 0次 | 上传用户:cocomalully
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一宝盖洞水库位于湖南浏阳县浏阳河的支流宝盖河上,距离源头约13公里的峡谷之处,为单纯的灌溉水库。于1952年12月15日开工,1953年7月20日完工。工程经费全部由国家投资,共计人民币306,750元。坝的类型系土石混合坝,坝高33.6公尺,长82公尺,水库正常蓄水量862万公方。在1953年修成后,曾灌田15,980亩。宝盖洞水库的拦河坝于1954年7月25日中午12时左右,由于水漫坝顶,以致崩垮。这时库内存水 A treasure cave reservoir Liuyang County in Hunan Liuyang River tributary of the Baogai River, about 13 km from the source of the gorge where, as a simple irrigation reservoirs. Started on December 15, 1952 and completed on July 20, 1953. The project funds are all invested by the state, totaling RMB 306,750 yuan. The type of dam is a mixture of earth and rock dam, the dam height of 33.6 meters, 82 meters long, reservoir normal water storage 8.62 million square. After its completion in 1953, it had irrigated 15,980 mu. Baigdong reservoir dam in July 25, 1954 at noon about 12, due to the water-dam top, so collapse collapse. At this time, the memory of the library
其他文献
南山铁矿凹山选厂由于目前矿山的开采已由氧化矿带逐渐向原生矿带过渡,铁矿物的嵌布粒度将随着开采深度的增加而逐渐变细,而原矿含铁品位却在逐年降低,近四年来累计共下降2.
据不完全的统计,在我国每年至少有40万把以上的截齿由于固定不可靠从采煤机截割滚筒上坠入煤海之中,并由此加剧了滚筒上其余截齿的各种损坏情况和采煤机机电事故的发生,从而
1月16日,以“新发展理念指导下的中国”为主题的“国研智库论坛·新年论坛2016”在北京友谊宾馆举行。国务院发展研究中心主任李伟在论坛上发表主旨演讲。国务院发展研究中心
本文认为解决不同级别矿产储量的单位勘查成本的计算方法,对于地质成果承包或有偿转让都有重要的现实意义。但不同意按工程控制间距的网度系数直接折算各个级别储量勘查成本
当冶金矿山电动机的功率在200千瓦以上时,为改善功率因数,多采用同步电动机,如空气压缩机、轴流风机、水泵、球磨等大型机械设备。过去的同步电动机均采用电动机——发电机
为适应修建三峡工程需要,水利部科教同于1992年8月组织了有关13个单位专家、教授,进行“三峡枢纽下游荆江河道考察”。考察河段上起荆江松滋口,下至藕池口,重点考察了荆江三
On the basis of the reality of recent tectonic movement and discarding such a viewpoint that the isostatic adjust-ment only results from excessive or insufficie
 我市处于北部高寒地区,无霜期短,年降水偏少,积温偏低,给大豆生产带来了不利的影响。采用大豆覆膜栽培可有效的解决这一问题。在生产上,大豆覆膜产量可达 4200公斤 /公顷 ,较不
科学管理的一个重要特征就是协调性,使得团队协作更具现实和可行性。通过科学实验、科学分析、科学搭配、科学规范为团队中每一个人最大潜能的发挥、团队的 An important fe
<正> 本文以云锡玻璃钢摇床面三年来在生产中的使用和系统检测为依据,论述了玻璃钢床面的设计制造特点、机械性能、选别效果和经济性,从而确认玻璃钢床面应推广使用。制作木