概况:深圳特区赤湾石油基地码头二期工程,位于赤湾港防波堤内东侧角隅地带。该码头主要停靠三用石油工作船,亦可停靠5000吨级运输船舶,为南海石油开发工作服务。除台风期间外,营运上需要保证全天候作业,泊稳条件为:码头前波高小于0.5米。 考虑到风浪方向及本段岸线反射波对附近泊位的影响,通过模型试验验证,要求码
Overview: Shenzhen Special Economic Zone, Chiwan Petroleum Terminal Pier Phase II project, located in the Chiwan Harbor breakwater in the eastern corner of the zone. The terminal is mainly docked with three working oil ships, can also dock 5000-ton ships, for the South China Sea oil development work. In addition to the typhoon period, the operation needs to ensure that all-weather operation, parked conditions are: the wave height of less than 0.5 meters before the pier. Taking into account the direction of the wind and waves and the impact of the shoreline reflected waves on the berths in the vicinity, the model test verifies that the requirement code