截止3月底,一期工程的泗阳、刘老涧、蔺家坝、韩庄等9座泵站和中运河南段影响处理工程的初步设计已完成,为二期工程作准备的运西线邵泊湖、高邮湖的地质勘探及测量已结束,抬高洪泽湖、骆马湖、南四湖兴利水位的研究工作正在进行。武汉水院、河海大学已完成优化调度研究,全线优化调度研究由南京水文资源研究所进行。调水泵站的研究取得进
As of the end of March, the preliminary design of the 9 pumping stations of Siyang, Liulaojian, Linjiaba and Hanzhuang of the first phase of the project and the impact treatment project of the south section of the Central Canal had been completed, and Yunxi Line Shao Po Lake, Gaoyou Lake geological exploration and measurement has ended, raising Hongze Lake, Luoma Lake, Nansi Lake Xingli water level research work is under way. Wuhan Hydropower Station and Hohai University have completed the research on optimal dispatching, and the optimization research on all lines has been conducted by the Nanjing Hydrological Resources Institute. Water pumping station research advances