论文部分内容阅读
鉴于以往从事中小型水利枢纽工程地质勘察提交的图件资料过于复杂,且部分图件在设计上缺乏实际用途,如果仍然保持提交那样多的图件,则远远不能满足大跃进的新形势要求,且必然会造成人力、物力方面的—些浪费。为了贯彻多、快、好、省的精神,更加密切配合地方水利建设的高潮,实行“边勘测、边设计、边施工”的方针,这就必然要求提交的地质资料能密切配合设计方面的要求,因而我们认为有必
In view of the complicated picture files submitted in previous geological surveys of small and medium-sized hydro-junction projects and the lack of practical use of some maps in their design, if we still submit as many maps as they are submitted, they will far be unable to meet the new requirements of the Great Leap Forward , And will inevitably result in manpower and material resources - some waste. In order to carry out the principle of “multi-lateral, rapid, good and provincial” and more closely cooperate with the climax of local water conservancy construction, the principle of “carrying out surveying, designing at the same time and building at the same time” should be implemented. This inevitably requires that the submitted geological data closely follow the design requirements , So we think it is necessary