水处理工艺中膜设备安装目前尚无统一规范的定额项目可执行,因而研究编制膜处理工程消耗量定额,以对接、适配新市政工程量清单计算规范,为建设各方编制综合单价、计算工程造价提供必要的基准参考具有迫切的现实需求。结合新全国市政工程消耗量定额修编,提出膜工艺安装子目规划与步距设置的关键技术路线,阐述规定计量单位分项工程工料机消耗量的取定方法,并依据案例对定额水平测算对比、检验子目含量构成的合理性。构建定额初步框架体系后,基于膜装置项目特征中规模参数的步距约束,指示定额子目运用拓展路径,为编制行业、地区同类专业概预算计价标准提供技术指引。
Currently there is no standardized fixed-value project in the water treatment process. Therefore, the research and design of membrane treatment project consumption quota is studied to meet the requirements of the new municipal engineering quantity calculation specification, and the comprehensive price is calculated for all parties involved in construction Project cost to provide the necessary benchmark reference has urgent practical needs. Combined with the new National Municipality Consumption Quota revision proposed membrane technology installation sub-head planning and step-by-step set of key technical routes, elaborated the provisions of the measurement unit sub-project consumables consumption method to take fixed, and according to the case of the quota level calculation Contrast, test sub-head content of the rationality. After establishing the preliminary framework system of fixed quotas, based on the step constraints of the scale parameters in the characteristics of the membrane project, we instruct the fixed sub-projects to use the expansion route to provide technical guidelines for the preparation of the budget estimates for similar projects in the industry and the region.