论文部分内容阅读
中国水利学会施工专业委员会于1984年6月27日至7月1日在湖南双牌县召开了预应力锚固技术经验交流会。出席会议的有35个单位49名代表。大会交流材料及报告14篇。与会代表参观了双牌水库工程和预应力锚固的现场施工操作。会议对葛州坝工程墩头锚固及白山水库采用的预应力锚索作了专题讨论。 预应力锚固技术,为水利水电建设中大跨度、高边墙的地下洞室、高边坡处理、加强建筑物的抗滑稳定及基岩加固提供了广阔阵地。它具有施工简便、效果显著、经济合理等优点。据统
Construction Committee of China Water Conservancy Society held a pre-stressed anchoring technology experience exchange meeting in Shuangpai County, Hunan Province from June 27 to July 1, There are 49 representatives from 35 units attending the meeting. General Assembly Exchange Materials and Reports 14. Participants visited the Shuangpai reservoir engineering and prestressed anchorage site construction operations. The meeting made a special discussion on the anchorage of Gezhouba dam project and the prestressed anchor cable used in Baishan Reservoir. Prestressed anchoring technology provides a broad base for the construction of large-span and high-side-wall underground caverns and high slopes in water conservancy and hydropower construction, strengthening the anti-skid stability of buildings and strengthening of bedrock. It has the advantages of simple construction, remarkable effect, economical and reasonable. According to the system