论文部分内容阅读
铁道部设计予算鑑定委員会在5月上旬对各院編制的给水所标准图初步设計进行了鑑定主要的鑑定意见有以下几点: 1.初步設計可按动力情况、水泵类型、台数等排列組合配套与編制图号。在每套图中将地面式、地下式H=1.0~2.0m和H=2.5~3.5m三种分別繪制。 2.根据调查了解,目前已有大型蒸汽往复泵和立式横水管鍋炉的供应、结合铁路部门的运用经验,蒸汽和电汽混合动力的线井給水所应以立式横水管鍋炉为主进行設計。在平面位置中要考虑有更换同样馬力立式横火管鍋炉的可能性。另外決定将一台4 K-8型电泵为运用,二台9VC型汽泵、二台40HP鍋炉为备用的
The Design Evaluation Committee of the Ministry of Railways conducted preliminary identification of the preliminary design of the water supply standard map prepared by each institute in early May. The main identification opinions include the following: 1. The preliminary design can be arranged according to power conditions, pump type, and number of units. Combination of supporting and drawing number. In each set of drawings, ground type, underground type H = 1.0 ~ 2.0m and H = 2.5 ~ 3.5m are respectively drawn. 2. According to the survey, there are currently large steam reciprocating pumps and vertical cross-tube boilers supplied, combined with the operational experience of the railway sector. Steam and electric steam mixed-line well water supply should be based on vertical cross-tube boilers. design. The possibility of replacing the same horsepower vertical crossfire tube boiler is considered in the flat position. In addition, it was decided to use a 4 K-8 type electric pump, two 9VC type steam pumps, and two 40 HP boilers as spares.