秦皇岛港新煤码头现已建成一、二期工程并投入使用。第一期工程的设计能力为1000万吨/年,有5万吨级及2万吨级泊位各一个,散料场的机械设备全部采用国内产品;第二期工程的设计能力为2000万吨/年,有5万吨级(可兼顾2.5万吨及7万吨级煤船停靠)泊位两个,散料场的机械设备全部从日本引进。本文分别介绍这两期工程的散料场设备布置概况及带式输送机、堆取料机等主要设备的技术性能和使用维修经验。
Qinhuangdao Port, the new coal terminal has now completed the first and second phase of the project and put into use. The first phase of the design capacity of 10 million tons / year, 50,000 tons and 20,000 tons of berths each one, the bulk of the mechanical equipment used in the field of domestic products; the second phase of the design capacity of 20 million tons There are two berths with a capacity of 50,000 tons (both 25,000 tons and 70,000 tons), all of which are imported from Japan. This article respectively introduces the layout of the bulk materials plant layout and the technical performance and service experience of the main equipment such as belt conveyors and stacker-reclaimer.