论文部分内容阅读
根据永定河生态修复过程中对河道补水水质、水量的要求,结合永定河丰台段的地质条件,建设人工湿地对永定河园博湖水体进行循环净化。通过大型垃圾回填坑地基处理技术的应用,使得园博园湿地的建设成为可能;并通过运行管理,提出了在后期维护管理过程中运行及监测重点,对人工湿地工程在严重缺水城市建设时的选址提供了新的思路。
According to the requirements of water quality and water volume in the course of ecological restoration in Yongding River and combined with the geological conditions of Fengtai section of Yongding River, the constructed wetland was used to purify the water body of Bo Lake in Yongding River Park. Through the application of large-size landfill pit foundation treatment technology, the construction of garden expo wetland is made possible. Through operation and management, the key points of operation and monitoring in the post-maintenance and management process are put forward. When the construction of constructed wetland project is under severe water shortage The location provides a new way of thinking.