论文部分内容阅读
随着天津港建设世界一流大港的步伐不断加快,港口码头建设相继立项开工,从而带动了大量大规模的基槽岸坡挖泥工程的稳步启动。通过对高桩码头基槽岸坡挖泥传统施工工艺的分析,大胆创新工艺,利用将高桩码头基槽岸坡的二阶段挖泥划分范围进行变动的方法来提高该类工程的施工质量、保证施工进度并降低施工成本。
With the continuous acceleration of the construction of Tianjin Port as a world-class big port, the construction of port terminals have been started one after another, which has led to the steady start-up of a large number of large-scale foundation ditches. Based on the analysis of the traditional construction technology of dredging for foundation piles of high-pile wharfs, the author boldly innovated the technology and improved the construction quality of such projects by using the method of changing the dividing range of two stages dredging of foundation pylons of piled wharfs, Ensure construction progress and reduce construction costs.