针对静17块开发中单井产量递减快,注水开发效果差的状况,为做到合理、高效开发油藏,在综合分析沙三段下部岩性、物性、剩余油分布等特征,以及成功实施静33-侧平71井的基础上,对该断块侧钻水平井整体部署的方案进行了研究。
In order to realize the reasonable and efficient development of reservoirs, the production of single wells in Qujing 17 is declining rapidly and the effect of water injection development is poor. In view of the characteristics of lithology, physical properties and remaining oil distribution in the lower part of Sha 3 Member and the successful implementation Static 33 - the side of Ping-71 wells on the basis of the block horizontal drilling horizontal drilling overall plan for the study.