DCS系统安装是核电建设的一个关键路径之一,它涉及到上游设计、供货、土建、机务、调试等各个专业,施工过程中相关接口多,协调难度大。安装施工前的风险分析与应对措施的制定是安装准备活动的最重要组成部分。本文针对红沿河DCS系统在安装施工中的各类风险进行了深入的分析,并对制定的应对措施作了相关的探讨。这些风险分析及应对措施在红沿河核电DCS系统安装实践中得到了很好的应用。
DCS system installation is one of the key paths for the construction of nuclear power. It involves various professions such as upstream design, supply, civil engineering, maintenance and commissioning. The related interfaces in the construction process are many and the coordination is difficult. Pre-construction risk analysis and response planning is the most important part of the installation preparation activities. In this paper, various risks of installation and construction of Hongyanhe DCS system are analyzed in depth, and the related measures are discussed. These risk analysis and countermeasures have been well applied in the installation of Hongyanhe Nuclear Power DCS system.