全断面泥浆式盾构在香港填海地区顶管施工中的应用

来源 :岩石力学与工程学报 | 被引量 : 0次 | 上传用户:jing8522
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Pipe jacking has become a popular method in drainage construction in Hong Kong. However, the varied ground conditions encountered in reclaimed land may pose severe problems to pipe jacking operation. This paper presents the experience of using the full face slurry shield for pipe jacking in a reclaimed area. The study shows that the full face slurry shield with a rock cutting head performs satisfactorily. To ensure the machine can work effectively in all ground conditions, other factors need to be considered including the rock cutting head being worn away, the hitting of under ground structures, the sustainability of jacked pipes alignment, the associated ground settlement and the damage to the jacked pipes caused by the jacking pressure.
其他文献
当今的高职德育工作必须紧紧围绕构建和谐社会这一理念进行,以塑造学生良好的思想道德品格为核心,促进和谐校园的建设.完善德育教育体系,建立和谐的德育机制;确立以学生为本的
昆明学院是云南省最早开展泰语教学的高校之一,本文以公共必修类课程“大学泰语”作为研究对象,通过5年实践教学研究,希望在泰语公共类课程建设上有所突破,形成具有时代特色的公
随着国家整体水平的不断提高,与外界交流的频繁增加,这就要求各高校不断提高大学生的英语水平。网络教学不仅能提高大学生的计算机水平,也能使大学生建立良好的自主学习能力,
利用奥地利岩土工程分析软件FINAL,考虑岩土的弹塑性性能,分析了侧压力系数变化对隧道衬砌力学行为的影响程度.计算中考虑了锚杆的作用和地下洞室开挖时的应力释放问题.结果
路面弯沉是反映路面各结构层整体强度和刚度的重要指标,是路基路面整体强度的重要参数,同时也与路面的使用状态存在着一定的内在联系。 Pavement deflection is an importan
为有效提高快速路交通事件检测的覆盖率,解决算法误判率较高的问题,本文通过分析交通事件发生时交通流参数在时间维与空间维的变化,分别提出了基于固定检测器的多参数判别算
自从1936年第1条海底隧道--日本关门隧道开始建造以来,世界各地已有近百条海底隧道相继建造.在特殊的环境地质条件下,建造海底隧道无疑是最安全经济、路线最短的方案.但海底
首先描述了尹家庄-中川机场高速公路K35+930~K36+410区段软弱地基加固处理工程的地质概况、基本物理力学特性和处理措施,然后介绍了试验检测的主要内容及其技术要点和稳定标准
目的设计并改进适合野战部队的可供单兵操作且能快速固定伤员并对伤员进行初救的担架。方法应用铝钛合金和聚乙烯材料,根据中国人体型制作单兵操作野战快速固定及运送担架,并
对动力车进行了详细的动力学计算和分析.分析结果表明:动力车的簧间质量对横向平稳性影响较大,设置合理的二系横向止挡间隙十分重要,二系横向减振器阻尼对平稳性的影响与二系