随着四川省煤矿企业集中进入整合期,省内原年产能6万t、9万t的矿井纷纷进入了技改扩能阶段。截至2013年1月,四川省有煤矿1 297家,其中生产矿井501家,建设矿井796家(新建矿井84家,扩建、技改矿井712家)。在近年的检测工作开展过程中,煤矿企业以技改为由推诿检测的情况比较普遍。在2013年1—3月全省煤矿企业检测检验周期到期时,应检和实际按期检测情况如下:煤矿在用设备到期应检矿井有242家,而按时实施了检测的矿井只有101家,占应检矿井总数的41.7%;以各种理由
As Sichuan’s coal mines enter the consolidation phase, the original annual production capacity of 60,000 t and 90,000 t in the province have entered the stage of technological transformation and expansion. As of January 2013, there were 1 297 coal mines in Sichuan Province, including 501 mines and 796 mines (84 new mines, 712 expansion and technological mines). In recent years, the testing carried out in the process of coal mines to push technological innovation in the detection of the situation is more common. From January to March 2013, when the testing and inspection cycle of the coal mining enterprises in the province expired, the inspection should be carried out as follows: The number of mines that should be mined in the coal mines during the expiration of the period was 242 while the number of mines tested in time was only 101 , Accounting for 41.7% of the total number of mines to be inspected; for various reasons