摘要:随着城市化发展,城市人口不断增多,城市生态平衡遭到破坏,导致气候发生变化,暴雨增加,加大了城市发生内涝灾害的可能性。城市内涝灾害频发,不仅影响社会正常发展,而且影响城市居民正常的工作和生活秩序。市政工程应当从城市规划、建设、管理各个环节,确立科学、系统的解决方案,从而减少城市内涝灾害的发生。
关键词:市政工程;内涝成因;解决对策
Abstract: with the development of city, city population increasing, city ecological balance is destroyed, causing climate change, rainfall increases, increase the possibility of city waterlogging disasters. City waterlogging disasters, not only affect the normal development of society, and the influence of city residents work and normal life order. Municipal engineering should be from the city planning, construction, management of each link, establish scientific solutions, system, thereby reducing the incidence of city waterlogging disaster
Keywords: Municipal Engineering; waterlogging causes; Countermeasures
中圖分类号: TU99 文献标识码:A 文章编号:2095-2104(2012
1、淮北市濉溪县城区基本概况
淮北市濉溪县位于淮北平原北部、黄淮海平原的南端,地处苏鲁豫皖四省之交,区域地貌单元主要有低山丘陵、山涧盆地和洪水冲积平原。低山丘陵与山涧盆地呈NNE向展布于本区中部,海拔32.0~50.0m;洪水冲积平原广泛分布于中南部地区,海拔为22.5~32.0m;平原区地势自西北向东南缓倾,平均地面坡降1.5/10000。
淮北市地下水污染原因主要由工业、生活、农药与化肥、大气污染四方面引起。在诸多因素中,人类活动占据了极大的比重。一是城市污水是指通过各种排污管道收集的所有排水,包括生活污水、工业污水、医院污水、合流制污水以及城市融雪和雨水,总之是一种混合污水。污水可通过污水管道中的缝隙渗入地下,从而污染地下水。二是工业废水污染。随着淮北市工业快速发展,工业废水的排放量很大。工业废水的特点是量大,成分复杂,难处理,不易降解和净化,对地下水水质构成严重威胁。三是生活污水污染。生活污水是人们日常生活中产生的各种污水的总称,其中包括厨房、浴室等排出的污水和厕所排出的含粪便污水等。随着人口的快速增长和城市化进程的加快,城市生活污水的排放量剧增。
淮北市多年平均降水量为862mm,但季节分配不均,降水65%以上集中在6、7、8、9月份,而且多以暴雨形式出现。因此,城市内涝灾害是指在一定的区域范围内,由于强降水或连续性降水超过了城市自身排水能力,致使城中内部产生淹没性损失的一种灾害………。城市内涝灾害发生期间,不仅会造成城市交通瘫痪,破坏城市正常的生活和工作秩序,还严重威胁着人民的生命及财产安全.
2、城市内涝灾害成因分析
2 .1城市居民环保意识薄弱
日常生活中部分市民不文明的习惯导致周围排水管道堵塞,这主要是 指一些人为因素,将垃圾倾入排水管网,造成管网的人为堵塞。
城市内很多的老城区都是雨污合流排水体制,城市居民将一些生活垃圾,如菜叶、瓜果皮、塑料制品等倾倒在排水口附近。这些物质在排水口长期堆积,久而久之就会阻塞管道。
2.2城市发展“重地上,轻地下”
随着城市化进程的加快,城市面积不断扩大,但城市建设者往往只看到城市面貌的不断美化、城市轮廓的不断伸展,却没有思考城市地下管网的更新建设能否跟得上地上设施的发展速度,原来的基础设施还能否承担城市扩大后的负荷,存在“重地上,轻地下”的错误思想,使得城市在不断变大的同时,配套的地下雨水管网却由于投入不足,建没缓慢,留下了一些安全隐患。
2.3城市环境的改变,恶劣天气频发
近年来,随着城市化进程发展迅猛,城市生态平衡遭到破坏,导致气候发生变化,暴雨增加,加大了城市发生内涝灾害的可能性。由于人类活动的影响,使城市打气温上升,形成“热岛效应”,城市上空气结层不稳定,引起热力对流。当城市中水汽充足时,容易形成对流云和对流降水;大量的城市建筑物,加大了地表粗糙度,阻碍降水系统的移动延长了降雨时间,增大了降雨强度。
此外,城市上空的大量污染物成为降雨的催化剂,在适当的情况下促进了降雨的形成,致使在总降雨量增加的同时,城市及城市周围的雨出现概率增加。
2 4路面过度硬化,天然水道消失
目前是城市化的高峰期,人口和财富不断向城市集中,城市面积越来越大,原来降雨之后可以调蓄雨水及流量的河流、湿地、农田等大面积的被水泥地、柏油路、硬质路面所取代,雨水通过入渗补给地下水的通道,造成城市水循环下垫面渗透系数减小,地表径流系数增大。同时雨水汇集、排出时间缩短,洪峰流增大,从而加大了城市排水系统的压力。
3、城市内涝灾害解决对策
3.1早预防科学规划排水系统
城市排水系统规划要与城市总体规划建设相协调,在城市规划之初优先考虑排水问题,从目前城市的排水设计标准来看,基本上是一年一遇,而面对暴雨,这样的标准显然过低,因此在规划排水系统时要具有前瞻性和超前性,加大雨水收集能力,既需提高现在的城市排水标准,又要考虑历史雨量,以及未来城市发展带来的新增量。既要提高雨水系统的达标率,又要提高雨水管网的设施覆盖率;在城市规划建设之初,就要留有足够的空间建设排水系统,并保证实现雨污分流。
3.2污水管网施工管理的技术要点
污水管道施工工艺流程:交桩——勘察一沟槽放线——沟槽开 挖
——沟槽验收一垫层施工——管道安装,护管砂、混凝土管肩施
工;质量控制,检查井施工——闭水试验——沟槽回填——竣工验收
3.2.1现场交桩
现场交桩是由建设单位向施工单位交付标高点和中心点。现场交桩是污水管网工程施工前的重要准备须努力做到:一是现场交桩点必须是经规划部门测定确认的;二是对现场交桩点进行复测,其闭合差必须在规定的误差范围内;三是对现场交桩点必须进行保护,必要时可将其引至隐蔽处加以保护。
3.2.2现场勘察。
现场勘察即为对污水管网沿线的地形进行实地查看,探明 地表物体、
地下管线,为施工方案的拟定积累充分的资料。现场勘察应主要做好如下工作:一是对地表的地形进行复测,并绘制 成图,为竣工结算积累资料;是对影响管网施工的围墙、建筑
物、树木等障碍物进行测量或数量清点,及时报建设单位及相关 部门认可,对增加的丁程量登记确认后,应抓紧做好各项协调、
拆移工作。
3.2.3沟槽放线。
沟槽放线就是按照|图纸、现场交桩点施工单位将管网中心线、沟槽底宽、沟槽上口宽度用白灰撒出。其质量控制要点有:一是严格按照交桩点放中心线;二是依据图纸、图集和《给水排水管道工程施工及验收规范》的要求,放出沟槽底宽灰线;三是根据工质情况,按照《给水排水管道工程施工及验收规范》的要求,计算放坡宽度后,放出沟槽,挖边线;四是将放好的中心线、沟槽底宽线、沟槽开挖边线报请监理单位和建设单位进行验收,无误后方可进行沟槽开挖。
3.2.4沟槽开挖
沟槽开挖是污水管网施工中最重要的环节之一。沟槽开挖的质最好坏直接影响后续沟槽验收,同时沟槽较深,安全隐患较多。施工中应把握如下几点:一是严格按放好的边线进行开挖;二是机械开挖时必须预留1 50—200mm厚土层。由人工清理,防止对原状土产生扰动;三是用水准仪、经纬仪对标高和中心线进行测量,确保标高和中心线位置准确无误;四是槽边堆上不能过高,堆土边缘距槽擘最小距离不虚小于0. 8m,多余的土必须先行运走;六是开挖沟槽及沟槽开挖后必须对施工沿线进行安全维护,防止邻近人员误入,造成安全事故。
3.2.5沟槽验收。
沟槽验收是在沟槽清理到位、标高和中心线复测无误后,由管理单位、建设单位、设计单位、施工单位、地质勘探单位共同参加、监督人员到场的情况下进行的,是污水管工程验收之重。沟槽验收的基本条件自:施工资料齐全;安全防护措施到位;槽底宽度、高程、平整度、放坡等符合要求;各参建单位主要负责人到场。符合要求后各参加单位签字确认。
3.2.6管道安装。
双壁波纹管施工质量要求:自下游向上游依次安装,承门与水流方向一致按图集要求,放置胶圈,承门与插口处涂润滑剂,采用紧管器或导链匀力将相邻两管节对接在一起;安装中,依据中线及时调整管节,始终应保持管道顺直、管中与中心线闭合、水泥管施工质量要求:将管子吊装至沟槽,管子与管子间预留10mm伸缩缝;依据中心线,调整管子位置,保持管中与中心线重合。、
3.2.7护管砂、混凝土管肩施工质量控制。
双壁波纹管安装完毕后,管侧及管顶应敷护管砂,其中管基900或1200或1800范围内必须用中粗砂填实,回填过程中应同时从管道两侧下料,保证安装好的管道不位移;管顶以上500n-m范围内可采用中粗砂、细砂或符合要求的细土回填。
3.2.8沟槽回填。
沟槽回填应分层夯实。但是回填中应重点控制如下几点:分层虚铺厚度不超过250mm;回填土应按要求见证取样试验;应特别注意井口周边的回填;严格杜绝超厚铺填、机械直接推土入槽等现
象。
3.2.9竣工驗收。
竣工验收是污水管网施工的关键。污水管网经竣工 验收合格后,
方可投入使用。竣工验收虚提供以下资料:竣工图及设计变更文件;主要材料和制品的合格证和试验记录;管道的位置及高程测量记录;通水试验记录;中间验收记录;回填土压实度的检验记录。竣工验收的主要内容:检查竣工验收资料;管道位置及高程;管道及附属构筑物的断面尺寸;外观检查,以上内容均符合要求,竣工验收为合格。
4结束语
做好污水管网工程的建设不仅能够减少环境污染,还能够加快城市发展的步伐。随着城市化进程仍将保持快速发展的态势,城市的规模必将进步扩大,本文通过研究探讨城市内涝问题的成因和解决对策,希望在后续的城市建设中能够根据实际情况,做好城市防洪减灾规划,做到未雨绸缪,对污水管网工程的建设要进行更加有效的管理,使之能够满足人们对幸福生活的需要。
参考文献:
【1】段承康,浅谈市政污水管网工程的施工管理[J]当代经济2012年5月
【2】李秀英等,对市政污水管网工程施工管理的分析【J】中国科技博览,2013、3
【3】刘永远,关于对市政工程排水施工工艺的研究,【J】建筑与文化,2013、5
关键词:市政工程;内涝成因;解决对策
Abstract: with the development of city, city population increasing, city ecological balance is destroyed, causing climate change, rainfall increases, increase the possibility of city waterlogging disasters. City waterlogging disasters, not only affect the normal development of society, and the influence of city residents work and normal life order. Municipal engineering should be from the city planning, construction, management of each link, establish scientific solutions, system, thereby reducing the incidence of city waterlogging disaster
Keywords: Municipal Engineering; waterlogging causes; Countermeasures
中圖分类号: TU99 文献标识码:A 文章编号:2095-2104(2012
1、淮北市濉溪县城区基本概况
淮北市濉溪县位于淮北平原北部、黄淮海平原的南端,地处苏鲁豫皖四省之交,区域地貌单元主要有低山丘陵、山涧盆地和洪水冲积平原。低山丘陵与山涧盆地呈NNE向展布于本区中部,海拔32.0~50.0m;洪水冲积平原广泛分布于中南部地区,海拔为22.5~32.0m;平原区地势自西北向东南缓倾,平均地面坡降1.5/10000。
淮北市地下水污染原因主要由工业、生活、农药与化肥、大气污染四方面引起。在诸多因素中,人类活动占据了极大的比重。一是城市污水是指通过各种排污管道收集的所有排水,包括生活污水、工业污水、医院污水、合流制污水以及城市融雪和雨水,总之是一种混合污水。污水可通过污水管道中的缝隙渗入地下,从而污染地下水。二是工业废水污染。随着淮北市工业快速发展,工业废水的排放量很大。工业废水的特点是量大,成分复杂,难处理,不易降解和净化,对地下水水质构成严重威胁。三是生活污水污染。生活污水是人们日常生活中产生的各种污水的总称,其中包括厨房、浴室等排出的污水和厕所排出的含粪便污水等。随着人口的快速增长和城市化进程的加快,城市生活污水的排放量剧增。
淮北市多年平均降水量为862mm,但季节分配不均,降水65%以上集中在6、7、8、9月份,而且多以暴雨形式出现。因此,城市内涝灾害是指在一定的区域范围内,由于强降水或连续性降水超过了城市自身排水能力,致使城中内部产生淹没性损失的一种灾害………。城市内涝灾害发生期间,不仅会造成城市交通瘫痪,破坏城市正常的生活和工作秩序,还严重威胁着人民的生命及财产安全.
2、城市内涝灾害成因分析
2 .1城市居民环保意识薄弱
日常生活中部分市民不文明的习惯导致周围排水管道堵塞,这主要是 指一些人为因素,将垃圾倾入排水管网,造成管网的人为堵塞。
城市内很多的老城区都是雨污合流排水体制,城市居民将一些生活垃圾,如菜叶、瓜果皮、塑料制品等倾倒在排水口附近。这些物质在排水口长期堆积,久而久之就会阻塞管道。
2.2城市发展“重地上,轻地下”
随着城市化进程的加快,城市面积不断扩大,但城市建设者往往只看到城市面貌的不断美化、城市轮廓的不断伸展,却没有思考城市地下管网的更新建设能否跟得上地上设施的发展速度,原来的基础设施还能否承担城市扩大后的负荷,存在“重地上,轻地下”的错误思想,使得城市在不断变大的同时,配套的地下雨水管网却由于投入不足,建没缓慢,留下了一些安全隐患。
2.3城市环境的改变,恶劣天气频发
近年来,随着城市化进程发展迅猛,城市生态平衡遭到破坏,导致气候发生变化,暴雨增加,加大了城市发生内涝灾害的可能性。由于人类活动的影响,使城市打气温上升,形成“热岛效应”,城市上空气结层不稳定,引起热力对流。当城市中水汽充足时,容易形成对流云和对流降水;大量的城市建筑物,加大了地表粗糙度,阻碍降水系统的移动延长了降雨时间,增大了降雨强度。
此外,城市上空的大量污染物成为降雨的催化剂,在适当的情况下促进了降雨的形成,致使在总降雨量增加的同时,城市及城市周围的雨出现概率增加。
2 4路面过度硬化,天然水道消失
目前是城市化的高峰期,人口和财富不断向城市集中,城市面积越来越大,原来降雨之后可以调蓄雨水及流量的河流、湿地、农田等大面积的被水泥地、柏油路、硬质路面所取代,雨水通过入渗补给地下水的通道,造成城市水循环下垫面渗透系数减小,地表径流系数增大。同时雨水汇集、排出时间缩短,洪峰流增大,从而加大了城市排水系统的压力。
3、城市内涝灾害解决对策
3.1早预防科学规划排水系统
城市排水系统规划要与城市总体规划建设相协调,在城市规划之初优先考虑排水问题,从目前城市的排水设计标准来看,基本上是一年一遇,而面对暴雨,这样的标准显然过低,因此在规划排水系统时要具有前瞻性和超前性,加大雨水收集能力,既需提高现在的城市排水标准,又要考虑历史雨量,以及未来城市发展带来的新增量。既要提高雨水系统的达标率,又要提高雨水管网的设施覆盖率;在城市规划建设之初,就要留有足够的空间建设排水系统,并保证实现雨污分流。
3.2污水管网施工管理的技术要点
污水管道施工工艺流程:交桩——勘察一沟槽放线——沟槽开 挖
——沟槽验收一垫层施工——管道安装,护管砂、混凝土管肩施
工;质量控制,检查井施工——闭水试验——沟槽回填——竣工验收
3.2.1现场交桩
现场交桩是由建设单位向施工单位交付标高点和中心点。现场交桩是污水管网工程施工前的重要准备须努力做到:一是现场交桩点必须是经规划部门测定确认的;二是对现场交桩点进行复测,其闭合差必须在规定的误差范围内;三是对现场交桩点必须进行保护,必要时可将其引至隐蔽处加以保护。
3.2.2现场勘察。
现场勘察即为对污水管网沿线的地形进行实地查看,探明 地表物体、
地下管线,为施工方案的拟定积累充分的资料。现场勘察应主要做好如下工作:一是对地表的地形进行复测,并绘制 成图,为竣工结算积累资料;是对影响管网施工的围墙、建筑
物、树木等障碍物进行测量或数量清点,及时报建设单位及相关 部门认可,对增加的丁程量登记确认后,应抓紧做好各项协调、
拆移工作。
3.2.3沟槽放线。
沟槽放线就是按照|图纸、现场交桩点施工单位将管网中心线、沟槽底宽、沟槽上口宽度用白灰撒出。其质量控制要点有:一是严格按照交桩点放中心线;二是依据图纸、图集和《给水排水管道工程施工及验收规范》的要求,放出沟槽底宽灰线;三是根据工质情况,按照《给水排水管道工程施工及验收规范》的要求,计算放坡宽度后,放出沟槽,挖边线;四是将放好的中心线、沟槽底宽线、沟槽开挖边线报请监理单位和建设单位进行验收,无误后方可进行沟槽开挖。
3.2.4沟槽开挖
沟槽开挖是污水管网施工中最重要的环节之一。沟槽开挖的质最好坏直接影响后续沟槽验收,同时沟槽较深,安全隐患较多。施工中应把握如下几点:一是严格按放好的边线进行开挖;二是机械开挖时必须预留1 50—200mm厚土层。由人工清理,防止对原状土产生扰动;三是用水准仪、经纬仪对标高和中心线进行测量,确保标高和中心线位置准确无误;四是槽边堆上不能过高,堆土边缘距槽擘最小距离不虚小于0. 8m,多余的土必须先行运走;六是开挖沟槽及沟槽开挖后必须对施工沿线进行安全维护,防止邻近人员误入,造成安全事故。
3.2.5沟槽验收。
沟槽验收是在沟槽清理到位、标高和中心线复测无误后,由管理单位、建设单位、设计单位、施工单位、地质勘探单位共同参加、监督人员到场的情况下进行的,是污水管工程验收之重。沟槽验收的基本条件自:施工资料齐全;安全防护措施到位;槽底宽度、高程、平整度、放坡等符合要求;各参建单位主要负责人到场。符合要求后各参加单位签字确认。
3.2.6管道安装。
双壁波纹管施工质量要求:自下游向上游依次安装,承门与水流方向一致按图集要求,放置胶圈,承门与插口处涂润滑剂,采用紧管器或导链匀力将相邻两管节对接在一起;安装中,依据中线及时调整管节,始终应保持管道顺直、管中与中心线闭合、水泥管施工质量要求:将管子吊装至沟槽,管子与管子间预留10mm伸缩缝;依据中心线,调整管子位置,保持管中与中心线重合。、
3.2.7护管砂、混凝土管肩施工质量控制。
双壁波纹管安装完毕后,管侧及管顶应敷护管砂,其中管基900或1200或1800范围内必须用中粗砂填实,回填过程中应同时从管道两侧下料,保证安装好的管道不位移;管顶以上500n-m范围内可采用中粗砂、细砂或符合要求的细土回填。
3.2.8沟槽回填。
沟槽回填应分层夯实。但是回填中应重点控制如下几点:分层虚铺厚度不超过250mm;回填土应按要求见证取样试验;应特别注意井口周边的回填;严格杜绝超厚铺填、机械直接推土入槽等现
象。
3.2.9竣工驗收。
竣工验收是污水管网施工的关键。污水管网经竣工 验收合格后,
方可投入使用。竣工验收虚提供以下资料:竣工图及设计变更文件;主要材料和制品的合格证和试验记录;管道的位置及高程测量记录;通水试验记录;中间验收记录;回填土压实度的检验记录。竣工验收的主要内容:检查竣工验收资料;管道位置及高程;管道及附属构筑物的断面尺寸;外观检查,以上内容均符合要求,竣工验收为合格。
4结束语
做好污水管网工程的建设不仅能够减少环境污染,还能够加快城市发展的步伐。随着城市化进程仍将保持快速发展的态势,城市的规模必将进步扩大,本文通过研究探讨城市内涝问题的成因和解决对策,希望在后续的城市建设中能够根据实际情况,做好城市防洪减灾规划,做到未雨绸缪,对污水管网工程的建设要进行更加有效的管理,使之能够满足人们对幸福生活的需要。