论文部分内容阅读
深圳市东部供水水源工程全长160km,由东部引水工程、网络干线工程、宝安分部工程和位于市中心的调度中心组成.供水调度自动控制系统是供水水源工程现代化管理的基础,是深圳市政府“三防”指挥决策支持系统的水源调度子系统,任务是对城市供水水源工程提供监测控制、数据采集处理、运行控制、优化调度及信息管理.介绍了深圳市东部供水水源工程概况,以及工程供水调度自动控制系统规划设计、功能要求、系统组成、系统优化调度和扩充的前景.
The eastern Shenzhen water supply source project has a total length of 160km and consists of the eastern diversion project, the network backbone project, the Baoan branch project, and the dispatch center located in the center of the city. The water supply dispatch automatic control system is the basis for the modern management of the water supply water source project and is the Shenzhen municipal government. The “three defenses” command decision support system’s water source dispatching subsystem is tasked with providing monitoring and control, data collection and processing, operation control, optimized dispatching, and information management for the urban water supply water source project. The water supply water source project in the eastern part of Shenzhen City is introduced, as well as engineering. Water supply scheduling automatic control system planning and design, functional requirements, system components, system optimization scheduling and expansion prospects.