论文部分内容阅读
中小型水库调洪演算的方法很多,目前仍以采用Д.И高切林法最为简捷,当设计的洪水过程线为三角形时,其计算式为:
There are many methods for flood control calculation of small and medium-sized reservoirs. At present, it is still the most simple method to adopt Д.И high-cutin method. When the designed flood process line is triangular, the formula is: