南渡江河口左岸海口段防洪工程位于南渡江下游左岸海口市境内,从海口市与琼山市交界的雅太村,经攀丹村、分流口至新埠桥,全长6.256公里,是一项具有防洪、造地、旅游等综合效益的水利工程。该项目初步设计投资19300万元人民币(调整后为14500,但不包括三座排涝泵站)。南渡江下游海口段是受洪潮灾害严重的地区。为了减轻洪潮灾害,从60年代起,
The left bank of Haikou section of the Nandu River Estuary flood control project is located in the lower reaches of the Nandu River on the left bank of Haikou City, from Haikou City and Joan Hill City at the junction of the Ya Tai Village, Pidan Village, shunt to Xinbu Bridge, a total length of 6.256 km, is a flood control, Land preparation, tourism and other comprehensive benefits of water conservancy projects. The initial design investment of 193 million yuan (adjusted to 14,500, but does not include three drainage pump station). Haikou section of the lower reaches of the Nandu River is heavily affected by flood disasters. In order to alleviate the flood disasters, from the 60’s,