论文部分内容阅读
同一个地下车站,因结构形式、覆土厚度、地质条件、水位埋深等不同,可以分段采用不同的抗浮措施,包括底板下设拉锚、底板设泄水盲管、围护结构上设压顶梁、增加自重、增加压重等,以达到最佳的效果。文中就深圳地铁5号线太安站采用的分段抗浮措施进行了探讨。
The same underground station may adopt different anti-flooding measures by different forms, such as structural form, thickness of covering soil, geological conditions and water depth, including the anchorage under the floor and the blind pipe on the floor, and the retaining structure Pressure roof beam, increase self-respect, increase weight, etc., in order to achieve the best results. This article discusses the anti-flooding measures adopted by Tai’an Station in Shenzhen Metro Line 5.