为了节约有色金属和钢材,简化控制室的设计,并便利运行起见,参照了1953年1月3日苏联电站部第3/a 号决定,结合本国情况,制定了节约控制电缆及减少控制盘的决定,自即日起实行。一切新的设计及正在进行中的初步设计,都应按照本决定办理。正在进行的技术设计和施工详图,在不严重影响工期及造成积压器材更大浪费的条件下,也应尽量按照本决定办理。 In order to save non-ferrous metals and steels, simplify the design of the control room, and facilitate the operation, reference was made to decision 3/a of the Ministry of Power Plant of the Soviet Union on January 3, 1953, in conjunction with the national situation, the development of control cables and control panels were reduced. It is decided that it will be implemented from that day. All new designs and preliminary designs in progress should be handled in accordance with this decision. Ongoing technical design and construction details should be handled in accordance with this decision as far as possible, without seriously affecting the construction period and resulting in greater waste of backlog equipment.
其他文献
请下载后查看,本文暂不支持在线获取查看简介。 Please download and view, this article does not support online access to view profile.
请下载后查看,本文暂不支持在线获取查看简介。 Please download and view, this article does not support online access to view profile.
[机械制造]从三月中创刊以来,已经出了九期。从这九期[机械制造]日有增加的发行额来看,我们发现这样一本刊物的确是为当前新中国所需要的。我们的创刊曾说[这个刊物的中心任
战後時期,苏联的机器製造工作者試造和掌握了許多新型的高生產率机器、机械裝置和設备。它們的特征是提高了能力和更適合於利用条件;但是同時应認为,創造新型机器的工作和替
一、学会組織座談会的經过中國机械工程学会上海分会,考虑到学会的学術研究活動应密切結合当前的生產,特别要和上海地方工廠的当前生產活动很好地结合起來,找出生產中的關键
请下载后查看,本文暂不支持在线获取查看简介。 Please download and view, this article does not support online access to view profile.
(一) 三年来,我们在机械(包括电器)工业中已经制造出了不少新产品。这些新产品很多都是过去不能制造的,例如八百水轮发电机、1.5公尺直径人字齿轮刨床、一O六公厘精密挡床、
第一廿厂铸铁车间,过去对熔铁的配料,主要技术问题,都掌握在老工友手里,一切根据生铁断面的粗细来估计含 的成份,对於强度及硬度根本无法控制。譬如,以前所做的200Hp气压缩
几年来,我会的统计工作基本上完成了上级交给的任务。对各级领导及时掌握国家计划执行情况与进行业务管理都起了一定的作用,同时也积累了一些经验,为今後统计工作的进一步开
施工程序的设计 设计施工程序是生产准备工作中的重要内容。设计工作包括:在制品及其部件装配时,制件加工及制造时以及毛胚生产时,确定合理的程序与合理的方法;确定设备;制订