一般情况下暗配线管在经过变形缝时,变形缝两侧的结构均为现浇梁结构,相关图集中只是通用做法,其具体做法应根据建筑物使用功能不同而灵活应用。暗配线管经过变形缝时,应根据变形缝的宽度和建筑物的使用功能以及线管管径大小确定具体做法。怎样在电气配管施工时更好地保证暗配线管在结构变形缝处的完整性和可靠性,笔者近年来在施工现场经常遇见这样的问题,在这里分析几种关于暗配线管过结构变形缝的做法,以便大家施工时参考。
Under normal circumstances, when the dark distribution pipe passes through the deformation joint, the structure on both sides of the deformation joint is a cast-in-place beam structure. The related atlas is only a common practice. The specific method should be flexibly applied according to different functions of the building. Dark distribution line through the deformation of the seam, should be based on the width of deformation joints and the use of buildings and pipe size to determine the specific approach. How to better ensure the integrality and reliability of the dark distribution pipe in the structural deformation joint when the electrical piping construction, the author often encountered such problems in the construction site in recent years, and analyzed several kinds of problems on the dark distribution pipe structure Deformation seam approach, so that everyone construction reference.