计划修建于锡达科斯河上的恩西索水利枢纽,是西班牙治理锡达科斯河的重点项目,目前正处于施工阶段。工程建成后具有调洪、灌溉、供水、维持生态流量等多种功能。通过模型试验优化了设计部件的水力运行性能。介绍了工程建设的目的、目前已开展的工作以及通过模型试验得出的结论。
The Nishixuo Hydroelectric Project, planned to be built on the Cidasco River, is a key project for the Spanish Cedas River and is currently under construction. After the completion of the project, it has many functions such as flood control, irrigation, water supply and ecological flow maintenance. Through the model test, the hydraulic running performance of the designed parts is optimized. The purpose of the project construction, the work already carried out and the conclusion drawn by the model test are introduced.