论文部分内容阅读
分析宝鸡枢纽现状及存在的问题,结合宝鸡城市规划及交通枢纽规划,对拟建的西安一宝鸡客运专线引入,以及客运站选址进行技术经济方案研究。研究提出客运专线接入既有宝鸡站和新建高速客运站两类4个方案,重点对新建站方案进行了技术经济分析和优缺点比较,研究推荐在马营镇新建高速客运站方案。
Based on the analysis of the current situation and existing problems of Baoji hub and the planning of Baoji city and the planning of transportation hub, the introduction of the proposed Xi’an-Baoji passenger dedicated line and the study of technical and economic solutions for the location of the terminal are carried out. The research proposes that the passenger dedicated line should connect two existing projects, ie the existing Baoji station and the new high-speed passenger station. The technical and economic analysis and the comparison of advantages and disadvantages of the proposed new station are emphasized. The proposal of establishing a new high-speed passenger terminal in Maying Town is proposed.