论文部分内容阅读
组织民兵“参建”是新时期国防后备力量建设服从经济建设中心的具体体现。而有计划、成建制、大规模地开展劳动竞赛,又是促进“参建”深入发展,提高民兵生产力和战斗力的重要途径。近十年来,葛洲坝集团公司武装部,紧紧围绕三峡工程建设实际,天力开展劳动竞赛,取得了辉煌战果:所属二公司、地下工程公司民兵营提前36天打通的长1481米,断面11×10.6米花岗岩体的茅坪溪泄水隧洞“民兵工程”,刷新了月进尺223.4米的国内同行新纪录。基础工程公司民兵营完成的1291.84米的一期土石围堰防渗墙,创造了40.66米特大槽,一次浇筑混凝土774立方米,成墙截水面积
Organizing militiamen to take part in construction is a concrete manifestation of obeying the center of economic construction of the national defense reserve forces in the new period. To carry out the labor competition in a planned and established way and on a large scale is also an important way to promote further development of the “participation and construction” and increase the militia’s productivity and combat effectiveness. In the past ten years, the Armed Forces of Gezhouba Group Company focused closely on the actual construction of the Three Gorges Project and started a labor competition with Tianli. The Company achieved brilliant results. Its subsidiary company and underground engineering company militia battalion opened 1481 meters ahead of schedule for 36 days, and section 11 × The 10.6-meter granite Maoping River drainage tunnel “militia project”, set a record new domestic record of 223.4 meters on a monthly basis. Basic engineering company militia battalion completed 1291.84 m of a soil cofferdam impervious wall, creating a 40.66 m large tank, a concrete pouring 774 cubic meters, into the wall of the water cut-off area