Analysis of alternatives for using cable bolts as primary support at two low-seam coal mines

来源 :International Journal of Mining Science and Technology | 被引量 : 0次 | 上传用户:michaelwf
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Cable bolts are sometimes used in low-seam coal mines to provide support in difficult ground conditions.This paper describes cable bolting solutions at two low-seam coal mines in similar ground conditions.Both mines used support systems incorporating cable bolts as part of the primary support system.Two original cable bolt based support systems as well as two modified systems are evaluated to estimate their ability to prevent large roof falls. One of the support systems incorporated passive cable bolts,while the other used pre-tensioned cable bolts. The results and experience at the mines showed that the modified systems provided improved stability over the original support systems. The presence of the cable bolts is the most important contribution to stability against large roof falls,rather than the details of the support pattern. It was also found that a heavy steel channel can improve the safety of the system because of the ‘sling’ action it provides. Additionally,the analysis showed that fully-grouted rebar bolts load much earlier than the cable bolts,and pre-tensioning of the cable bolts can result in a more uniform distribution of loading in the roof. Cable bolts are sometimes used in low-seam coal mines to provide support in difficult ground conditions. This paper describes cable bolting solutions at two low-seam coal mines in similar ground conditions. support system.Two original cable bolt based support systems as well as two modified systems are evaluated to estimate their ability to prevent large roof falls. One of the support systems incorporated passive cable bolts, while the other used pre-tensioned cable bolts. and experience at the mines showed that the modified systems provided improved stability over the original support systems. The presence of the cable bolts is the most important contribution to stability against large roof falls, rather than the details of the support pattern. It was also found that a heavy steel channel can improve the safety of the system because of ’sling’ action it provided owed that fully-grouted rebar bolts load much earlier than the cable bolts, and pre-tensioning of the cable bolts can result in a more uniform distribution of loading in the roof.
其他文献
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
本刊讯 记者孙晓璐报道为规范工程设计市场秩序,维护工程设计合同当事人的合法权益,近日,住房城乡建设部、工商总局两部门联合发布了《建设工程设计合同示范文本(房屋建筑工
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
TCD用于了解脑血管状态已被广泛应用于临床,而TCD用于压颈试验来了解脑血管侧枝供血的方法未见报道。1 资料和方法1.1 临床资料 脑血管疾病患者40例,男8例,女性32例,其中颈
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
兰州石化公司乙烯厂汽油加氢装置一段加氢反应器R102顶部入口管道优化项目中,在对管道焊接工艺使用上我们套用设备制造公司现有的15CrMo同种材质管道焊接工艺评定中的方案内
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊