对某项目的基坑工程进行降水设计,利用管井井点降水,用Dupuit公式对基坑的涌水量进行计算,同时确定井点数量以及对降水井井位进行合理布置,并对基坑内水位降深进行了验算和降水时间进行预测,可供相关工程参考。
Dewatering design of the foundation pit project of a project was carried out. The water discharge of tube well was calculated, and Dupuit’s formula was used to calculate the water inflow of foundation pit. At the same time, the number of well points was determined and the well position of descending wells was reasonably arranged. Deep checking and precipitation forecasting time, for the relevant project reference.