加快矿井建设速度、缩短建井周期是当务之急,也是全面提高建井工程技术经济指标、尽快发挥投资效益的关键问题。随着我国煤矿开发的现代化,矿井井型逐步增大,建井工程量随之增大,建井地质条件越来越复杂,施工难度加大,因此,加强矿井建设的组织领导、提高技术水平、强化施工装备和进行科学管理是十分必要的,除应及时总结推广我国快速建井的成功经验、加强薄弱技术环节的科研攻关外,积极学习国外的先进技术和有益经验,也是必不可少的。本文原载《煤炭科技动态》1981年第8期,概括介绍了苏联一个大型矿井提前建成投产的先进经验,对我们很有借鉴意义。钟子云同志参阅后很重视,并指出:“对世界各国一切先进而有益的技术,都应认真学习。”特在本刊转载,供研究参考。
Accelerating the speed of mine construction and shortening the period of establishing wells are the top priorities and also the key issues for improving the technical and economic indicators of well construction engineering in an all-round way and for making investment returns as soon as possible. With the modernization of coal mine development in our country, the well shape of the mine gradually increases, the amount of the well construction increases, the geological conditions for the well construction become more and more complicated, and the construction is more difficult. Therefore, strengthening the organization and leadership of the mine construction and improving the technical level , It is necessary to strengthen the construction equipment and conduct scientific management. In addition to summing up the successful experience of promoting rapid well construction in China and strengthening scientific research in weak technical links, it is also essential to actively learn advanced technologies and useful experiences from abroad . This article was originally published in “Coal Science and Technology Dynamics” No. 8 of 1981, which outlines in detail the advanced experience of a large Soviet mine put into operation ahead of schedule, which is of great reference to us. Comrade Zhong Ziyun paid great attention to it after reading it and pointed out: “All advanced and useful technologies in all countries in the world should be conscientiously studied.” Special Report is reproduced in our journal for reference.