论文部分内容阅读
石油工程项目的风险管理是石油工程项目管理中的重要环节,是复杂的系统化的工程。国际石油建筑工程的风险因素众多,风险的评价以及其重要的风险评价模型都是基于对数字的定量性的技术。本文主要采用FHW(模糊、灰色、物元空间)法评价国际石油工程项目的风险,对我国石油企业的国际工程项目进行风险的分析,再进行风险类别的鉴别,最后将我国国际石油工程项目的风险管理评价结果与国外相关的进行对比,找出存在的问题,然后提出对策。
The risk management of petroleum engineering project is an important link in the management of petroleum engineering project, which is a complex and systematic project. There are many risk factors in international petroleum construction projects. The assessment of risks and their important risk assessment models are based on the quantification of numbers. This paper mainly uses FHW (fuzzy, gray, matter-element space) method to evaluate the risks of international petroleum engineering projects, analyzes the risks of international engineering projects of petroleum enterprises in our country, and then identifies the risk categories. Finally, The results of risk management evaluation are compared with those of other countries to find out the existing problems and then propose the countermeasures.