北京地铁五号线刘家窑车站受站位及环境条件限制,车站两端采用明挖法施工,中间采用暗挖法施工。文章侧重讨论车站暗挖段的施工方案的确定,以及采用中洞法的施工步骤。
Beijing Subway Line Liujiayao Station by the station and the environmental conditions, station ends by using open-cut construction method, the middle of the use of undercutting construction. The article focuses on the determination of the construction scheme of the station undercutting section and the construction steps of using the middle hole method.