论文部分内容阅读
实物保护系统工作与核燃料进场、装料密切相关,是核燃料进场检查、装料检查的重要项目。电站实物保护系统的组成部分有出入口控制系统、周界探测报警系统、电视监控系统、集成控制及管理系统、供电系统等五个系统。为了使核电站实物保护系统的整体性能得到实现,各个子系统由集成控制及管理系统统一协调调度管理来达到目的,本文主要对实物保护系统做了简单介绍,并对安装及调试过程中出现的经验反馈进行了论述。
Physical protection system work and nuclear fuel approach, loading are closely related to nuclear fuel approach inspection, loading inspection of the important items. Part of the physical protection system of power station control system entrance and exit, the perimeter detection alarm system, television monitoring system, integrated control and management system, power supply system, five systems. In order to achieve the overall performance of the physical protection system of nuclear power plant achieved, the various subsystems by the integrated control and management system unified scheduling management to achieve the purpose of this article mainly on physical protection system made a simple introduction, and installation and commissioning process experience Feedback is discussed.