林大辅博士是我国的老朋友,参观了狮子山选矿厂,提了宝贵意见,我们表示感謝! 选厂原设计1000吨/日规模,设备是可以的。经两次扩建到3000吨/日,矿石供应不上,还是不能增产。也就是文中所指出的:“要大量增产,就必然造成这种现象”,“提高处理量所需的数据尚不充分”等反复說明这个问题。但又提出3000吨/日是“历史条件所造成,不能用当前的设计思想来討论这个问題”,意指不要大改了。以3000吨/日来衡量,则设备分三个系统,用单段球磨和螺旋分级机……等,就不合适了(按林博士的含意,系统太多,应用棒—球磨较好,並用水力旋流器)。批评了选厂管理工作,如磨、浮控制,原矿品位波动等,不一定要很詳细处理,稍加措施也可以解决问题。
Dr. Lin Dayu is an old friend of our country, visited the Lion Rock Concentrator, made valuable comments, we express our gratitude! Plant selection of the original design 1,000 tons / day scale, equipment is OK. After two expansion to 3,000 tons / day, ore supply is not on, or can not increase production. That is to say, the article states: “It is inevitable that a large increase in production will inevitably result in this phenomenon.” “The data required to increase throughput are not yet sufficient,” and so on, repeatedly explain this issue. However, it is proposed that 3,000 tons / day is “caused by historical conditions and can not be discussed under the current design concept”, which means that no major changes should be made. To 3000 tons / day to measure, the equipment is divided into three systems, with a single ball milling and spiral classifier ... ... and so on, it is inappropriate (Dr. Lam’s meaning, the system too much, the application of stick - ball milling better, and use Hydrocyclone). Criticized the selection of plant management, such as grinding, floating control, fluctuations in ore grade, etc., do not have to be very detailed, a little measure can also solve the problem.