对蒲石河抽水蓄能电站地下厂房、开关站等两段直流母线在操作切换中,存在短时中断供电情况的设计缺陷进行分析,提出改进措施。
The design defects of power supply in short period were analyzed and the improvement measures were put forward for the two DC bus bars of underground powerhouse and switch station of Pushihe Pumped Storage Power Station.