尊村引黄设计总装机近7万千瓦,控制灌溉面积166万亩,受益地区系山西省主要粮棉产地之一。一级站是尊村引黄电力提灌的关键工程,安装64ZLB—50型水泵9台,与其配套的动力是800千瓦同步电动机,1978年春投入运行,截止1986年底,共运行16785台时,抽水4.5亿立方米,对该区农业生产的发展发挥了积极作用,但由于泵站建成后,黄河河床不断淤高,工作扬程发生了较大变
Zuncun Yellow River design total installed capacity of nearly 70,000 kilowatts, 1660000 acres of irrigated area control, beneficiary of the Department of Shanxi Province, one of the main grain and cotton producing areas. The first station is the key project of Zuncun Yellow River irrigation. Nine 64ZLB-50 type pumps are installed. The auxiliary power is 800kw synchronous motor, and put into operation in the spring of 1978. By the end of 1986, a total of 16,785 units were operated and pumping 4.5 Billion cubic meters, the development of agricultural production in the area has played an active role, but due to the completion of the pumping station, the Yellow River bed silting constantly high, the working lift has changed a lot