论文部分内容阅读
本文介绍隔河岩水电厂计算机监控系统安装调试及试运行期间出现的问题,及其原因分析和处理结果。
This paper introduces the problems that occurred during the installation, commissioning and commissioning of the computer monitoring system at Geheyan Hydropower Plant, as well as the reasons for the problems and the processing results.